NumberTruthUnit Converter · Calculator Grid

Concrete Volume Calculator

Cubic yards (and cubic meters) of concrete for a slab — adds 10 % waste buffer for ordering.

Concrete Volume

Slab volume in cubic yards / meters (+10% waste)

Volume2.4691358 yd³
Cubic feet66.666667
Cubic meters1.8877898
Order with 10% waste2.7160494 yd³
Your inputs are encoded in this URL — copy it to share a configured calculator.

About this tool

Compute concrete volume for a rectangular slab in cubic yards (the standard ordering unit in the US) and cubic meters (rest of world). Includes a 10 % waste buffer.

Formula

cubicFeet = length × width × (depth / 12). cubicYards = cubicFeet / 27.

Worked example

20 × 10 × 4 in → 800 ft³ × ⅔ = 533 ft³? No: 20·10·(4/12) = 66.7 ft³ = 2.47 yd³. Order ≈ 2.7 yd³.

Notes

For large pours, get a structural engineer involved. Concrete trucks typically deliver 8–10 yd³ per load with a partial-load fee for less.